Adams, ND interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 4 with terminal status (shown grayed).

1active projects
150active MW
5total filed
Queue IDProjectkVMWResourceStatus
G751 Not reported 230 200 Wind Withdrawn
G757 Not reported n/r 200 Wind Withdrawn
G752 Not reported 230 150 Wind Operational
G781 Not reported 115 150 Wind Withdrawn
J218 Not reported 230 150 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.