Adams, ND interconnection queue
1 active project totaling 150 MW in the MISO queue, plus 4 with terminal status (shown grayed).
1active projects
150active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G751 | Not reported | 230 | 200 | Wind | Withdrawn |
| G757 | Not reported | n/r | 200 | Wind | Withdrawn |
| G752 | Not reported | 230 | 150 | Wind | Operational |
| G781 | Not reported | 115 | 150 | Wind | Withdrawn |
| J218 | Not reported | 230 | 150 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.