Substation Scout

Campbell Substation substation interconnection queue

2 active projects totaling 778 MW in the MISO queue.

2 MISO queue filings name Campbell Substation as the point of interconnection, all in Ottawa County, MI.

2active projects
778active MW
2total filed
Queue IDProjectkVMWResourceStatus
R1040 Replacing 749 MW of coal generation with BESS; Campbell 3 345 749 Hybrid Active
G479 Not reported 345 29 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first