MISO request G424

MISO queue ID G424

Queue request G424 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW wind project in St. Louis County, MN, according to Berkeley Lab’s queue data file. The filing names Minntac Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 31, 2005.

Queue IDG424
Project nameNot reported
Status (as published)Operational
SubstationMinntac Substation
Point of interconnectionMinntac Substation
CountySt. Louis
StateMN
VoltageNot reported
Capacity100 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2005-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Minntac Substation substation: 3 requests in the MISO queue, 1 active totaling 100 MW.

Queue IDProjectMWResourceStatus
G591Not reported700GasWithdrawn
G660Not reported50WindWithdrawn

St. Louis, MN: 11 requests in the MISO queue, 1 active totaling 100 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2004-04-19
Interconnection agreement date2006-08-04
Operational date2005-12-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.