St. Louis, MN interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 10 with terminal status (shown grayed).

1active projects
100active MW
11total filed
Queue IDProjectkVMWResourceStatus
G591 Not reported 230 700 Gas Withdrawn
G477 Not reported n/r 552 Coal Withdrawn
J2569 Not reported 115 300 Battery Withdrawn
G377 Not reported n/r 200 Wind Withdrawn
J3405 Not reported 230 144 Wind Withdrawn
G424 Not reported n/r 100 Wind Operational
G509 Not reported 115 75 Wind Withdrawn
G329 Not reported 138 50 Wind Withdrawn
G660 Not reported 115 50 Wind Withdrawn
J175 Not reported 115 30 Other Withdrawn
G950 Not reported n/r 25 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.