Substation Scout

MISO request G389

MISO queue ID G389

Queue request G389 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW gas project in Sherburne County, MN, according to Berkeley Lab’s queue data file. The filing names Elk River substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 1, 2004.

Queue IDG389
Project nameNot reported
Status (as published)Operational
SubstationElk River substation
Point of interconnectionElk River 230 kV substation
CountySherburne
StateMN
Voltage230 kV
Capacity200 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2004-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Elk River substation substation: 2 requests in the MISO queue, 1 active totaling 200 MW.

Queue IDProjectMWResourceStatus
G390Not reported100GasWithdrawn

Sherburne, MN: 15 requests in the MISO queue, 7 active totaling 1,818.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2003-11-03
Interconnection agreement date2007-10-25
Operational date2004-08-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first