Substation Scout

Sherburne, MN interconnection queue

7 active projects totaling 1,818.9 MW in the MISO queue, plus 8 with terminal status (shown grayed).

7active projects
1,818.9active MW
15total filed
Queue IDProjectkVMWResourceStatus
R1036 Replacing 710 MW of coal generation with solar at Sherco Unit 2; Sherco Unit 2 345 710 Hybrid Active
E0041 Sherco South BESS 345 313.9 Battery Active
J1337 Not reported 345 300 Solar Withdrawn
J3289 Not reported n/r 235 Gas Active
G389 Not reported 230 200 Gas Operational
J1531 Not reported 345 200 Solar Withdrawn
J1605 Not reported n/r 200 Solar Active
G169 Not reported n/r 120 Coal Withdrawn
G390 Not reported 230 100 Gas Withdrawn
J3439 Not reported 69 100 Solar Active
J349 Not reported n/r 100 Solar Withdrawn
J547 Not reported n/r 100 Solar Withdrawn
G930 Not reported n/r 60 Coal Operational
J869 Not reported 69 50 Solar Withdrawn
R1005 Replace 49 MW of GRE.ELKRI1 Unit with Gas/Oil; Elk River 1 69 49 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first