Substation Scout

Elk River substation substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Elk River substation as the point of interconnection, all in Sherburne County, MN.

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
G389 Not reported 230 200 Gas Operational
G390 Not reported 230 100 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.