Substation Scout

MISO request G343

MISO queue ID G343

Queue request G343 was listed in the MISO interconnection queue at the end of 2025 as a 20 MW project in Baraga County, MI, according to Berkeley Lab’s queue data file. The filing names Warden Gen Station as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of May 1, 2002.

Queue IDG343
Project nameNot reported
Status (as published)Operational
SubstationWarden Gen Station
Point of interconnectionWarden Gen Station
CountyBaraga
StateMI
VoltageNot reported
Capacity20 MW
Resource (as published)Diesel
Resource categoryOther (normalized for filtering)
Proposed online date2002-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Warden Gen Station substation: 2 requests in the MISO queue, 2 active totaling 38 MW.

Queue IDProjectMWResourceStatus
G342Not reported18GasOperational

Baraga, MI: 8 requests in the MISO queue, 4 active totaling 94.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG343 G343
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2003-06-01
Interconnection agreement date2003-06-30
Operational date2002-05-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first