Substation Scout

Baraga, MI interconnection queue

4 active projects totaling 94.7 MW in the MISO queue, plus 4 with terminal status (shown grayed).

4active projects
94.7active MW
8total filed
Queue IDProjectkVMWResourceStatus
J711 Not reported 138 130 Wind Withdrawn
J3648 Not reported 138 120 Hybrid Withdrawn
J1138 Not reported 138 70 Wind Withdrawn
J879 Not reported 138 70 Wind Withdrawn
J704 Not reported 138 54.9 Gas Operational
G343 Not reported n/r 20 Other Operational
G342 Not reported n/r 18 Gas Operational
J3800 Not reported n/r 1.8 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.