Substation Scout

Warden Gen Station substation interconnection queue

2 active projects totaling 38 MW in the MISO queue.

2 MISO queue filings name Warden Gen Station as the point of interconnection, all in Baraga County, MI.

2active projects
38active MW
2total filed
Queue IDProjectkVMWResourceStatus
G343 Not reported n/r 20 Other Operational
G342 Not reported n/r 18 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first