Substation Scout

MISO request G171

MISO queue ID G171

Queue request G171 was listed in the MISO interconnection queue at the end of 2025 as a 14 MW wind project in Dodge County, MN, according to Berkeley Lab’s queue data file. The filing names Dodge Center Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue IDG171
Project nameNot reported
Status (as published)Operational
SubstationDodge Center Substation
Point of interconnectionDodge Center Substation
CountyDodge
StateMN
VoltageNot reported
Capacity14 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Dodge Center Substation substation: 2 requests in the MISO queue, 2 active totaling 33 MW.

Queue IDProjectMWResourceStatus
G242Not reported19WindOperational

Dodge, MN: 11 requests in the MISO queue, 3 active totaling 34 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2002-01-16
Interconnection agreement date2003-03-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.