Substation Scout

Dodge, MN interconnection queue

3 active projects totaling 34 MW in the MISO queue, plus 8 with terminal status (shown grayed).

3active projects
34active MW
11total filed
Queue IDProjectkVMWResourceStatus
G882 Not reported 345 1,500 Wind Withdrawn
G796 Not reported 161 300 Wind Withdrawn
G852 Not reported 161 300 Wind Withdrawn
G779 Not reported 161 259.9 Wind Withdrawn
J310 Not reported 161 200 Wind Withdrawn
J441 Not reported 345 170 Wind Withdrawn
J182 Not reported n/r 150 Wind Withdrawn
G239 Not reported 69 63 Wind Withdrawn
G242 Not reported n/r 19 Wind Operational
G171 Not reported n/r 14 Wind Operational
J554 Not reported 69 1 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.