Substation Scout

Washington, MS interconnection queue

3 active projects totaling 670 MW in the MISO queue, plus 8 with terminal status (shown grayed).

3active projects
670active MW
11total filed
Queue IDProjectkVMWResourceStatus
J2175 Not reported 230 350 Solar Withdrawn
J4121 Not reported 230 300 Solar Active
J1458 Not reported 230 200 Solar Active
J3126 Not reported 115 200 Solar Withdrawn
J3375 Not reported 230 200 Solar Withdrawn
J3748 Not reported 230 200 Hybrid Withdrawn
J945 Not reported 230 200 Solar Withdrawn
S1127 Not reported 230 170 Battery Active
J1070 Not reported 115 100 Solar Withdrawn
J2905 Not reported 115 100 Hybrid Withdrawn
J3657 Not reported n/r 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first