MISO request J1458

MISO queue ID J1458

Queue request J1458 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW solar project in Washington County, MS, according to Berkeley Lab’s queue data file. The filing names Ray Braswell - Tinnin - Gerald Andrus Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 15, 2024.

Queue IDJ1458
Project nameNot reported
Status (as published)Active
SubstationRay Braswell - Tinnin - Gerald Andrus Line
Point of interconnectionRay Braswell - Tinnin - Gerald Andrus 230kV Line
CountyWashington
StateMS
Voltage230 kV
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2024-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Washington, MS: 11 requests in the MISO queue, 3 active totaling 670 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY MISSISSIPPI
ClusterDPP-2019 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA Complete; Post GIA Status: Under Construction
Queue date2019-04-29
Interconnection agreement date2022-01-25

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.