3 active projects totaling 500 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3active projects
500active MW
6total filed
Queue IDProjectkVMWResourceStatus
J1061 Not reported 345 300 Solar Withdrawn
J3848 Not reported n/r 250 Battery Active
J2600 Not reported 161 245 Solar Withdrawn
J2601 Not reported 345 200 Battery Active
J1032 Not reported 345 50 Battery Withdrawn
J2867 Not reported n/r 50 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.