MISO request J2867

MISO queue ID J2867

Queue request J2867 was listed in the MISO interconnection queue at the end of 2025 as a 50 MW solar project in Wabasha County, MN, according to Berkeley Lab’s queue data file. The filing names Lake City (A) to Zumbro Falls (B) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 31, 2029.

Queue IDJ2867
Project nameNot reported
Status (as published)Active
SubstationLake City (A) to Zumbro Falls (B)
Point of interconnectionLake City (A) to Zumbro Falls (B)
CountyWabasha
StateMN
VoltageNot reported
Capacity50 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2029-08-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Wabasha, MN: 6 requests in the MISO queue, 3 active totaling 500 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityROCHESTER PUBLIC UTILITIES
ClusterDPP-2022 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.