Vermillion, IN interconnection queue

5 active projects totaling 3,465 MW in the MISO queue, plus 16 with terminal status (shown grayed).

5active projects
3,465active MW
21total filed
Queue IDProjectkVMWResourceStatus
J3999 Not reported 345 1,540 Gas Active
J802 Not reported 345 1,244 Gas Withdrawn
J434 Not reported 345 1,185 Gas Withdrawn
R1044 Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2 230 1,040 Hybrid Active
J240 Not reported 230 720 Gas Withdrawn
J1288 Not reported 345 667.2 Gas Withdrawn
J3232 Not reported n/r 500 Gas Active
J3487 Not reported n/r 400 Solar Withdrawn
J3488 Not reported n/r 400 Battery Withdrawn
G080 Not reported n/r 320 Other Withdrawn
J2132 Not reported 230 300 Wind Withdrawn
J3678 Not reported n/r 300 Battery Withdrawn
J3694 Not reported 345 300 Battery Withdrawn
J2723 Not reported 138 249 Wind Withdrawn
J1348 Not reported 345 200 Solar Active
J1457 Not reported 345 200 Solar Withdrawn
J1518 Not reported n/r 185 Solar Active
J2130 Not reported 230 180 Solar Withdrawn
G079 Not reported n/r 160 Other Withdrawn
J2712 Not reported n/r 75 Solar Withdrawn
J1517 Not reported 230 40 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.