Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2
MISO queue ID R1044
Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2 (R1044) was listed in the MISO interconnection queue at the end of 2025 as a 1,040 MW hybrid project in Vermillion County, IN, according to Berkeley Lab’s queue data file. The filing names Cayuga Steam Station Switchyards and as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 31, 2028.
| Queue ID | R1044 |
|---|---|
| Project name | Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2 |
| Status (as published) | Active |
| Substation | Cayuga Steam Station Switchyards and |
| Point of interconnection | Cayuga Steam Station Switchyards 230kV and 345kV |
| County | Vermillion |
| State | IN |
| Voltage | 230 kV |
| Capacity | 1,040 MW |
| Resource (as published) | Gas+Other |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2028-03-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Vermillion, IN: 21 requests in the MISO queue, 5 active totaling 3,465 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | DUKE ENERGY INDIANA |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2024-02-06 |
| Components (hybrid) | Gas 1040 MW + Other |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.