Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2

MISO queue ID R1044

Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2 (R1044) was listed in the MISO interconnection queue at the end of 2025 as a 1,040 MW hybrid project in Vermillion County, IN, according to Berkeley Lab’s queue data file. The filing names Cayuga Steam Station Switchyards and as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 31, 2028.

Queue IDR1044
Project nameReplacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2
Status (as published)Active
SubstationCayuga Steam Station Switchyards and
Point of interconnectionCayuga Steam Station Switchyards 230kV and 345kV
CountyVermillion
StateIN
Voltage230 kV
Capacity1,040 MW
Resource (as published)Gas+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-03-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Vermillion, IN: 21 requests in the MISO queue, 5 active totaling 3,465 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
Interconnection serviceNRIS
Project typeGeneration
Queue date2024-02-06
Components (hybrid)Gas 1040 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.