Substation Scout

MISO request J3232

MISO queue ID J3232

Queue request J3232 was listed in the MISO interconnection queue at the end of 2025 as a 500 MW gas project in Vermillion County, IN, according to Berkeley Lab’s queue data file. The filing names CAYUGA STATION as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 31, 2028.

Queue IDJ3232
Project nameNot reported
Status (as published)Active
SubstationCAYUGA STATION
Point of interconnectionCAYUGA STATION
CountyVermillion
StateIN
VoltageNot reported
Capacity500 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2028-08-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Vermillion, IN: 21 requests in the MISO queue, 5 active totaling 3,465 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
ClusterDPP-2023 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-11

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first