Tangipahoa Parish, LA interconnection queue

7 active projects totaling 847.9 MW in the MISO queue, plus 5 with terminal status (shown grayed).

7active projects
847.9active MW
12total filed
Queue IDProjectkVMWResourceStatus
E0024 Amite Energy Storage II 115 207.9 Battery Active
J1870 Not reported 230 200 Solar Active
J2152 Not reported 230 120 Hybrid Active
J1219 Not reported 115 100 Solar Active
J3365 Not reported 115 100 Solar Withdrawn
J909 Not reported 115 100 Solar Active
S1076 Surplus; J909 115 100 Hybrid Active
J1871 Not reported 230 60 Battery Withdrawn
J2013 Not reported n/r 52.9 Battery Withdrawn
J1985 Not reported n/r 50 Solar Withdrawn
J1257 Not reported 115 20 Battery Active
J2012 Not reported n/r 20 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.