Queue request J1257 was listed in the MISO interconnection queue at the end of 2025 as a 20 MW battery project in Tangipahoa Parish, LA, according to Berkeley Lab’s queue data file. The filing names Chicken Farm - Amite Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 24, 2024.

Queue IDJ1257
Project nameNot reported
Status (as published)Active
SubstationChicken Farm - Amite Line
Point of interconnectionChicken Farm - Amite 115 kV Line
CountyTangipahoa Parish
StateLA
Voltage115 kV
Capacity20 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2024-09-24
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Chicken Farm - Amite Line substation: 2 requests in the MISO queue, 2 active totaling 120 MW.

Queue IDProjectMWResourceStatus
J1219Not reported100SolarActive

Tangipahoa Parish, LA: 12 requests in the MISO queue, 7 active totaling 847.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY LOUISIANA
ClusterDPP-2019 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA Complete; Post GIA Status: Under Construction
Queue date2019-04-29
Interconnection agreement date2021-11-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first