Substation Scout

MISO request J2152

MISO queue ID J2152

Queue request J2152 was listed in the MISO interconnection queue at the end of 2025 as a 120 MW hybrid project in Tangipahoa Parish, LA, according to Berkeley Lab’s queue data file. The filing names INDEPENDENCE [LA] - HAMMOND as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2025.

Queue IDJ2152
Project nameNot reported
Status (as published)Active
SubstationINDEPENDENCE [LA] - HAMMOND
Point of interconnectionINDEPENDENCE [LA] - HAMMOND 230.0kV
CountyTangipahoa Parish
StateLA
Voltage230 kV
Capacity120 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tangipahoa Parish, LA: 12 requests in the MISO queue, 7 active totaling 847.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY LOUISIANA
ClusterDPP-2021 South
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2023-11-30
Components (hybrid)Solar 120 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.