Sunflower, MS interconnection queue

11 active projects totaling 1,669 MW in the MISO queue, plus 14 with terminal status (shown grayed).

11active projects
1,669active MW
25total filed
Queue IDProjectkVMWResourceStatus
J3623 Not reported 230 350 Wind Active
J3774 Not reported 230 303 Solar Withdrawn
J686 Not reported n/r 250 Wind Withdrawn
J3595 Not reported 230 230 Solar Withdrawn
J2289 Not reported n/r 200 Solar Active
J4189 Not reported 115 200 Solar Active
J1404 Not reported 115 167 Wind Withdrawn
J3900 Not reported 230 163 Wind Active
J2558 Not reported 115 150 Solar Withdrawn
J2740 Not reported 115 150 Solar Active
J2869 Not reported 230 150 Hybrid Active
J3366 Not reported 230 150 Wind Withdrawn
J2560 Not reported 115 130 Solar Withdrawn
J2297 Not reported 230 100 Solar Active
J2741 Not reported 115 100 Solar Withdrawn
J2763 Not reported 115 100 Hybrid Active
J3806 Not reported 115 100 Solar Withdrawn
J604 Not reported 115 100 Solar Active
J1294 Not reported 115 99 Solar Active
J1113 Not reported 115 85 Solar Withdrawn
J2313 Not reported n/r 80 Solar Withdrawn
S1049 Surplus; J1294 115 80 Hybrid Withdrawn
J3592 Not reported 230 57 Wind Active
J2320 Not reported n/r 40 Battery Withdrawn
J3101 Not reported 115 20 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.