MISO request J1294
MISO queue ID J1294
Queue request J1294 was listed in the MISO interconnection queue at the end of 2025 as a 99 MW solar project in Sunflower County, MS, according to Berkeley Lab’s queue data file. The filing names Indianola - Cleveland Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2023.
| Queue ID | J1294 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Indianola - Cleveland Line |
| Point of interconnection | Indianola - Cleveland 115kV Line |
| County | Sunflower |
| State | MS |
| Voltage | 115 kV |
| Capacity | 99 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2023-12-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Sunflower, MS: 25 requests in the MISO queue, 11 active totaling 1,669 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ENTERGY MISSISSIPPI |
|---|---|
| Cluster | DPP-2019 South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Study Phase: GIA Complete; Post GIA Status: Under Construction |
| Queue date | 2019-04-29 |
| Interconnection agreement date | 2022-01-25 |
| Operational date | 2024-08-02 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.