Merom Storage

MISO queue ID APP-100245

Merom Storage (APP-100245) was listed in the MISO interconnection queue at the end of 2025 as a 405 MW hybrid project in Sullivan County, IN, according to Berkeley Lab’s queue data file. The filing names Merom Storage Collector Sub as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 5, 2028.

Queue IDAPP-100245
Project nameMerom Storage
Status (as published)Active
SubstationMerom Storage Collector Sub
Point of interconnectionMerom Storage Collector Sub 345kV
CountySullivan
StateIN
Voltage345 kV
Capacity405 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-08-05
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sullivan, IN: 27 requests in the MISO queue, 20 active totaling 6,576.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityHoosier Energy
DeveloperHoosier Energy / Solvenz
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: In Review; Post GIA Status: Not started
Queue date2025-12-19
Components (hybrid)Solar 405 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.