St. Louis, MO interconnection queue
2 active projects totaling 922.8 MW in the MISO queue.
2active projects
922.8active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| R1047 | Replacing 864 MW of coal with Natural Gas Generators; Castle Bluff | 138 | 824 | Hybrid | Active |
| R1059 | Replacing 95 MW of coal with BESS; Meramec 1, 2, 3, 4 | 138 | 98.8 | Hybrid | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.