St. Louis, MO interconnection queue

2 active projects totaling 922.8 MW in the MISO queue.

2active projects
922.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
R1047 Replacing 864 MW of coal with Natural Gas Generators; Castle Bluff 138 824 Hybrid Active
R1059 Replacing 95 MW of coal with BESS; Meramec 1, 2, 3, 4 138 98.8 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.