Replacing 95 MW of coal with BESS; Meramec 1, 2, 3, 4
MISO queue ID R1059
Replacing 95 MW of coal with BESS; Meramec 1, 2, 3, 4 (R1059) was listed in the MISO interconnection queue at the end of 2025 as a 98.8 MW hybrid project in St. Louis County, MO, according to Berkeley Lab’s queue data file. The filing names Meramec Plant ‚Äì Switchyard as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2025.
| Queue ID | R1059 |
|---|---|
| Project name | Replacing 95 MW of coal with BESS; Meramec 1, 2, 3, 4 |
| Status (as published) | Active |
| Substation | Meramec Plant – Switchyard |
| Point of interconnection | Meramec Plant – 138KV Switchyard |
| County | St. Louis |
| State | MO |
| Voltage | 138 kV |
| Capacity | 98.8 MW |
| Resource (as published) | Other+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2025-12-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
St. Louis, MO: 2 requests in the MISO queue, 2 active totaling 922.8 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN MISSOURI |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2024-12-16 |
| Components (hybrid) | Other 98.8 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.