Replacing 864 MW of coal with Natural Gas Generators; Castle Bluff (R1047) was listed in the MISO interconnection queue at the end of 2025 as a 824 MW hybrid project in St. Louis County, MO, according to Berkeley Lab’s queue data file. The filing names Meramec Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2025.
| Queue ID | R1047 |
|---|---|
| Project name | Replacing 864 MW of coal with Natural Gas Generators; Castle Bluff |
| Status (as published) | Active |
| Substation | Meramec Substation |
| Point of interconnection | Meramec Substation 138kV |
| County | St. Louis |
| State | MO |
| Voltage | 138 kV |
| Capacity | 824 MW |
| Resource (as published) | Gas+Other |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2025-12-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
St. Louis, MO: 2 requests in the MISO queue, 2 active totaling 922.8 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN MISSOURI |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2024-05-28 |
| Components (hybrid) | Gas 824 MW + Other |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.