St. Landry Parish, LA interconnection queue

7 active projects totaling 1,412.6 MW in the MISO queue, plus 4 with terminal status (shown grayed).

7active projects
1,412.6active MW
11total filed
Queue IDProjectkVMWResourceStatus
J3311 Not reported n/r 400 Battery Withdrawn
J3840 Not reported n/r 300 Battery Active
J4075 Not reported 230 300 Battery Active
J1217 Not reported 230 200 Solar Withdrawn
J3368 Not reported 230 199.9 Wind Active
J2714 Not reported n/r 162 Solar Active
J3394 Not reported 230 155.6 Wind Active
J1644 Not reported n/r 150 Solar Active
J1832 Not reported 138 145.1 Solar Operational
J1236 Not reported 230 50 Battery Withdrawn
J619 Not reported 69 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.