Substation Scout

MISO request J2714

MISO queue ID J2714

Queue request J2714 was listed in the MISO interconnection queue at the end of 2025 as a 162 MW solar project in St. Landry Parish, LA, according to Berkeley Lab’s queue data file. The filing names Eunice as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 15, 2027.

Queue IDJ2714
Project nameNot reported
Status (as published)Active
SubstationEunice
Point of interconnectionEunice
CountySt. Landry Parish
StateLA
VoltageNot reported
Capacity162 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-04-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

St. Landry Parish, LA: 11 requests in the MISO queue, 7 active totaling 1,412.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityCLECO POWER
ClusterDPP-2022 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first