Substation Scout

St. Francis, AR interconnection queue

5 active projects totaling 1,330.9 MW in the MISO queue, plus 7 with terminal status (shown grayed).

5active projects
1,330.9active MW
12total filed
Queue IDProjectkVMWResourceStatus
J1060 Not reported 500 500 Solar Active
S1125 Not reported 500 400 Hybrid Active
S1101 Surplus; J1434 230 200 Battery Active
J3381 Not reported 161 150.9 Hybrid Active
J2431 Not reported 500 150 Battery Withdrawn
J696 Not reported n/r 150 Solar Withdrawn
J3071 Not reported 161 140 Hybrid Withdrawn
J972 Not reported 161 140 Solar Withdrawn
J1147 Not reported 161 100 Solar Withdrawn
J678 Not reported n/r 100 Solar Withdrawn
J4038 Not reported 161 80 Hybrid Active
J1167 Not reported 161 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first