Queue request J3381 was listed in the MISO interconnection queue at the end of 2025 as a 150.9 MW hybrid project in St. Francis County, AR, according to Berkeley Lab’s queue data file. The filing names FORREST CITY SOUTH - HUGHES as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2028.

Queue IDJ3381
Project nameNot reported
Status (as published)Active
SubstationFORREST CITY SOUTH - HUGHES
Point of interconnectionFORREST CITY SOUTH - HUGHES 161.0kV
CountySt. Francis
StateAR
Voltage161 kV
Capacity150.9 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

St. Francis, AR: 12 requests in the MISO queue, 5 active totaling 1,330.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY ARKANSAS
ClusterDPP-2023 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-18
Withdrawn date2026-01-07
Components (hybrid)Solar 150.92 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first