Shiawassee, MI interconnection queue
7 active projects totaling 1,409 MW in the MISO queue, plus 11 with terminal status (shown grayed).
7active projects
1,409active MW
18total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3640 | Not reported | 345 | 300 | Wind | Withdrawn |
| J3865 | Not reported | 138 | 250 | Wind | Active |
| J796 | Not reported | 138 | 239 | Solar | Operational |
| J3864 | Not reported | 345 | 230 | Wind | Active |
| J195 | Not reported | 138 | 200 | Wind | Withdrawn |
| J2672 | Not reported | 138 | 200 | Solar | Active |
| J602 | Not reported | 138 | 200 | Wind | Withdrawn |
| J187 | Not reported | 138 | 198 | Wind | Withdrawn |
| J1089 | Not reported | 138 | 170 | Solar | Withdrawn |
| J1297 | Not reported | 138 | 170 | Solar | Active |
| R5063 | Replacing 160 MW of Solar with 80 MW of Solar and 90 MW of BESS; Bell Solar | 138 | 170 | Hybrid | Active |
| J1088 | Not reported | 138 | 150 | Solar | Withdrawn |
| J1394 | Not reported | 138 | 150 | Solar | Withdrawn |
| J4122 | Not reported | n/r | 150 | Battery | Active |
| J264 | Not reported | 138 | 120.8 | Wind | Withdrawn |
| J925 | Not reported | 138 | 50 | Solar | Withdrawn |
| S1038 | Surplus; J796 | 138 | 50 | Hybrid | Withdrawn |
| G250 | Not reported | n/r | 4 | Other | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.