Replacing 160 MW of Solar with 80 MW of Solar and 90 MW of BESS; Bell Solar

MISO queue ID R5063

Replacing 160 MW of Solar with 80 MW of Solar and 90 MW of BESS; Bell Solar (R5063) was listed in the MISO interconnection queue at the end of 2025 as a 170 MW hybrid project in Shiawassee County, MI, according to Berkeley Lab’s queue data file. The filing names BELL ROAD - CORNELL as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue IDR5063
Project nameReplacing 160 MW of Solar with 80 MW of Solar and 90 MW of BESS; Bell Solar
Status (as published)Active
SubstationBELL ROAD - CORNELL
Point of interconnectionBELL ROAD - CORNELL 138.0kV
CountyShiawassee
StateMI
Voltage138 kV
Capacity170 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Shiawassee, MI: 18 requests in the MISO queue, 7 active totaling 1,409 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
Project typeGeneration
Queue date2025-05-09
Components (hybrid)Solar 170 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.