Replacing 160 MW of Solar with 80 MW of Solar and 90 MW of BESS; Bell Solar
MISO queue ID R5063
Replacing 160 MW of Solar with 80 MW of Solar and 90 MW of BESS; Bell Solar (R5063) was listed in the MISO interconnection queue at the end of 2025 as a 170 MW hybrid project in Shiawassee County, MI, according to Berkeley Lab’s queue data file. The filing names BELL ROAD - CORNELL as its point of interconnection. Its status as of December 31, 2025 was “Active”.
| Queue ID | R5063 |
|---|---|
| Project name | Replacing 160 MW of Solar with 80 MW of Solar and 90 MW of BESS; Bell Solar |
| Status (as published) | Active |
| Substation | BELL ROAD - CORNELL |
| Point of interconnection | BELL ROAD - CORNELL 138.0kV |
| County | Shiawassee |
| State | MI |
| Voltage | 138 kV |
| Capacity | 170 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | Not reported |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Shiawassee, MI: 18 requests in the MISO queue, 7 active totaling 1,409 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | METC |
|---|---|
| Project type | Generation |
| Queue date | 2025-05-09 |
| Components (hybrid) | Solar 170 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.