MISO request J796
MISO queue ID J796
Queue request J796 was listed in the MISO interconnection queue at the end of 2025 as a 239 MW solar project in Shiawassee County, MI, according to Berkeley Lab’s queue data file. The filing names Goss Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 20, 2020.
| Queue ID | J796 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Goss Substation |
| Point of interconnection | Goss 138kV Substation |
| County | Shiawassee |
| State | MI |
| Voltage | 138 kV |
| Capacity | 239 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2020-11-20 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Goss Substation substation: 2 requests in the MISO queue, 1 active totaling 239 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J602 | Not reported | 200 | Wind | Withdrawn |
Shiawassee, MI: 18 requests in the MISO queue, 7 active totaling 1,409 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | METC |
|---|---|
| Cluster | DPP-2017-AUG East (ITC) |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: In Service |
| Queue date | 2017-06-16 |
| Interconnection agreement date | 2020-06-12 |
| Operational date | 2020-11-20 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.