Replacing 710 MW of coal generation with solar at Sherco Unit 2; Sherco Unit 2
MISO queue ID R1036
Replacing 710 MW of coal generation with solar at Sherco Unit 2; Sherco Unit 2 (R1036) was listed in the MISO interconnection queue at the end of 2025 as a 710 MW hybrid project in Sherburne County, MN, according to Berkeley Lab’s queue data file. The filing names Sherburne County Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 30, 2024.
| Queue ID | R1036 |
|---|---|
| Project name | Replacing 710 MW of coal generation with solar at Sherco Unit 2; Sherco Unit 2 |
| Status (as published) | Active |
| Substation | Sherburne County Substation |
| Point of interconnection | Sherburne County 345kV Substation |
| County | Sherburne |
| State | MN |
| Voltage | 345 kV |
| Capacity | 710 MW |
| Resource (as published) | Solar+Other |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2024-05-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Sherburne, MN: 15 requests in the MISO queue, 7 active totaling 1,818.9 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | NORTHERN STATES POWER COMPANY |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2022-12-28 |
| Operational date | 2024-10-31 |
| Components (hybrid) | Solar 710 MW + Other |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.