Substation Scout

Replacing 710 MW of coal generation with solar at Sherco Unit 2; Sherco Unit 2

MISO queue ID R1036

Replacing 710 MW of coal generation with solar at Sherco Unit 2; Sherco Unit 2 (R1036) was listed in the MISO interconnection queue at the end of 2025 as a 710 MW hybrid project in Sherburne County, MN, according to Berkeley Lab’s queue data file. The filing names Sherburne County Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 30, 2024.

Queue IDR1036
Project nameReplacing 710 MW of coal generation with solar at Sherco Unit 2; Sherco Unit 2
Status (as published)Active
SubstationSherburne County Substation
Point of interconnectionSherburne County 345kV Substation
CountySherburne
StateMN
Voltage345 kV
Capacity710 MW
Resource (as published)Solar+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2024-05-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sherburne, MN: 15 requests in the MISO queue, 7 active totaling 1,818.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNORTHERN STATES POWER COMPANY
Interconnection serviceNRIS
Project typeGeneration
Queue date2022-12-28
Operational date2024-10-31
Components (hybrid)Solar 710 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first