Sheboygan, WI interconnection queue

7 active projects totaling 1,603.3 MW in the MISO queue, plus 4 with terminal status (shown grayed).

7active projects
1,603.3active MW
11total filed
Queue IDProjectkVMWResourceStatus
G166 Not reported n/r 2,400 Other Withdrawn
G052 Not reported n/r 1,000 Other Withdrawn
E0037 Not reported 345 454.8 Gas Active
G103 Not reported n/r 370 Wind Operational
R1049 Replacing 303.5 MW BESS with 303.5 MW COAL; Edgewater Unit 5 345 303.5 Hybrid Active
J1153 Not reported 138 150 Solar Operational
J3151 Not reported n/r 150 Gas Active
J3927 Not reported 138 150 Solar Withdrawn
J2055 Not reported n/r 100 Solar Active
J3161 Not reported 138 100 Battery Withdrawn
J1793 Not reported 138 75 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.