MISO queue ID G103

Queue request G103 was listed in the MISO interconnection queue at the end of 2025 as a 370 MW wind project in Sheboygan County, WI, according to Berkeley Lab’s queue data file. The filing names Point Beach - Sheboygan Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 1, 2004.

Queue IDG103
Project nameNot reported
Status (as published)Operational
SubstationPoint Beach - Sheboygan Switching Station
Point of interconnectionPoint Beach - Sheboygan Switching Station
CountySheboygan
StateWI
VoltageNot reported
Capacity370 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2004-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sheboygan, WI: 11 requests in the MISO queue, 7 active totaling 1,603.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG103 G103
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2001-06-20
Interconnection agreement date2004-01-06
Operational date2004-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.