Rock, MN interconnection queue

6 active projects totaling 664 MW in the MISO queue, plus 5 with terminal status (shown grayed).

6active projects
664active MW
11total filed
Queue IDProjectkVMWResourceStatus
J1325 Not reported 161 200 Solar Active
J1570 Not reported 161 200 Solar Withdrawn
J183 Not reported n/r 200 Wind Operational
J184 Not reported 115 100 Wind Withdrawn
J569 Not reported n/r 100 Wind Active
G893 Not reported 161 80 Wind Withdrawn
J1164 Not reported 161 80 Solar Active
J3397 Not reported n/r 80 Solar Withdrawn
S1078 Surplus; J1325 n/r 72 Battery Active
G576 Not reported 161 40 Wind Withdrawn
G253 Not reported 161 12 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.