MISO request G253
MISO queue ID G253
Queue request G253 was listed in the MISO interconnection queue at the end of 2025 as a 12 MW wind project in Rock County, MN, according to Berkeley Lab’s queue data file. The filing names Split Rock - Magnolia as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 1, 2002.
| Queue ID | G253 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Split Rock - Magnolia |
| Point of interconnection | Split Rock - Magnolia 161kV |
| County | Rock |
| State | MN |
| Voltage | 161 kV |
| Capacity | 12 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2002-11-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Split Rock - Magnolia substation: 2 requests in the MISO queue, 1 active totaling 12 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| G576 | Not reported | 40 | Wind | Withdrawn |
Rock, MN: 11 requests in the MISO queue, 6 active totaling 664 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Cluster | G253 G253 |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Network Upgrade |
| Queue date | 2002-09-09 |
| Interconnection agreement date | 2004-10-26 |
| Operational date | 2002-11-01 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.