Randolph, IL interconnection queue
4 active projects totaling 452.4 MW in the MISO queue, plus 5 with terminal status (shown grayed).
4active projects
452.4active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| IP05 | Not reported | n/r | 1,500 | Other | Withdrawn |
| J3074 | Not reported | 138 | 250 | Solar | Active |
| J1330 | Not reported | 345 | 200 | Solar | Withdrawn |
| J2927 | Not reported | n/r | 100 | Solar | Withdrawn |
| J808 | Not reported | 138 | 99 | Solar | Operational |
| J1202 | Not reported | 345 | 68.4 | Hybrid | Active |
| J3770 | Not reported | 345 | 45.8 | Solar | Withdrawn |
| J232 | Not reported | n/r | 35 | Coal | Operational |
| J854 | Not reported | 138 | 30 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.