Randolph, IL interconnection queue

4 active projects totaling 452.4 MW in the MISO queue, plus 5 with terminal status (shown grayed).

4active projects
452.4active MW
9total filed
Queue IDProjectkVMWResourceStatus
IP05 Not reported n/r 1,500 Other Withdrawn
J3074 Not reported 138 250 Solar Active
J1330 Not reported 345 200 Solar Withdrawn
J2927 Not reported n/r 100 Solar Withdrawn
J808 Not reported 138 99 Solar Operational
J1202 Not reported 345 68.4 Hybrid Active
J3770 Not reported 345 45.8 Solar Withdrawn
J232 Not reported n/r 35 Coal Operational
J854 Not reported 138 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.