MISO request J3074

MISO queue ID J3074

Queue request J3074 was listed in the MISO interconnection queue at the end of 2025 as a 250 MW solar project in Randolph County, IL, according to Berkeley Lab’s queue data file. The filing names 4TIBBS - 4STEELEVLE N as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 31, 2025.

Queue IDJ3074
Project nameNot reported
Status (as published)Active
Substation4TIBBS - 4STEELEVLE N
Point of interconnection4TIBBS - 4STEELEVLE N 138.0kV
CountyRandolph
StateIL
Voltage138 kV
Capacity250 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2025-08-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Randolph, IL: 9 requests in the MISO queue, 4 active totaling 452.4 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2022 Central
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.