Polk, TX interconnection queue
4 active projects totaling 725 MW in the MISO queue, plus 6 with terminal status (shown grayed).
4active projects
725active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3985 | Not reported | n/r | 240 | Hybrid | Active |
| J867 | Not reported | n/r | 200 | Solar | Withdrawn |
| J2754 | Not reported | 138 | 170 | Solar | Active |
| J1442 | Not reported | 138 | 165 | Solar | Active |
| J1030 | Not reported | 138 | 150 | Solar | Operational |
| J1278 | Not reported | 138 | 100 | Solar | Withdrawn |
| J2242 | Not reported | n/r | 100 | Hybrid | Withdrawn |
| J418 | Not reported | 138 | 100 | Solar | Withdrawn |
| J1962 | Not reported | 138 | 75 | Solar | Withdrawn |
| J1963 | Not reported | 138 | 25 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner