Queue request J3985 was listed in the MISO interconnection queue at the end of 2025 as a 240 MW hybrid project in Polk County, TX, according to Berkeley Lab’s queue data file. The filing names SHECO/ETEC, BUS# as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 2, 2030.

Queue IDJ3985
Project nameNot reported
Status (as published)Active
SubstationSHECO/ETEC, BUS#
Point of interconnectionSHECO/ETEC, BUS#334130
CountyPolk
StateTX
VoltageNot reported
Capacity240 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2030-09-02
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Polk, TX: 10 requests in the MISO queue, 4 active totaling 725 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP Cycle Pending South
Interconnection serviceNRIS
Project typeGeneration
Queue date2024-11-18
Components (hybrid)Solar 240 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.