Substation Scout

Pointe Coupee Parish, LA interconnection queue

5 active projects totaling 842 MW in the MISO queue, plus 3 with terminal status (shown grayed).

5active projects
842active MW
8total filed
Queue IDProjectkVMWResourceStatus
E0051 Point Coupee 500 377 Gas Active
J1368 Not reported 230 200 Solar Operational
J2183 Not reported n/r 200 Solar Withdrawn
J1465 Not reported 138 150 Solar Active
J3822 Not reported 138 139.6 Solar Withdrawn
J1372 Not reported 230 100 Solar Operational
J3083 Not reported 230 100 Solar Withdrawn
E002 Not reported 500 15 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first