Queue request E002 was listed in the MISO interconnection queue at the end of 2025 as a 15 MW gas project in Pointe Coupee Parish, LA, according to Berkeley Lab’s queue data file. The filing names switchyard at Big Cajon II as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue IDE002
Project nameNot reported
Status (as published)Operational
Substationswitchyard at Big Cajon II
Point of interconnection500 kV switchyard at Big Cajon II
CountyPointe Coupee Parish
StateLA
Voltage500 kV
Capacity15 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pointe Coupee Parish, LA: 8 requests in the MISO queue, 5 active totaling 842 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2013-09-13
Operational date2015-07-13

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first