Perry, MS interconnection queue

3 active projects totaling 500 MW in the MISO queue, plus 4 with terminal status (shown grayed).

3active projects
500active MW
7total filed
Queue IDProjectkVMWResourceStatus
J2999 Not reported n/r 250 Solar Active
J2992 Not reported 161 160 Battery Withdrawn
J4083 Not reported 161 150 Battery Active
J3447 Not reported 161 125 Solar Withdrawn
J3915 Not reported 161 125 Solar Withdrawn
J2980 Not reported 69 100 Solar Withdrawn
J3028 Not reported 161 100 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.