MISO request J4083

MISO queue ID J4083

Queue request J4083 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW battery project in Perry County, MS, according to Berkeley Lab’s queue data file. The filing names Purvis Bulk 161 - Hintonville 161 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2030.

Queue IDJ4083
Project nameNot reported
Status (as published)Active
SubstationPurvis Bulk 161 - Hintonville 161
Point of interconnectionPurvis Bulk 161 - Hintonville 161 161.0kV
CountyPerry
StateMS
Voltage161 kV
Capacity150 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2030-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Purvis Bulk 161 - Hintonville 161 substation: 3 requests in the MISO queue, 1 active totaling 150 MW.

Queue IDProjectMWResourceStatus
J3447Not reported125SolarWithdrawn
J3915Not reported125SolarWithdrawn

Perry, MS: 7 requests in the MISO queue, 3 active totaling 500 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityCOOPERATIVE ENERGY
ClusterDPP Cycle Pending South
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-10-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first