Palo Alto, IA interconnection queue

5 active projects totaling 990 MW in the MISO queue, plus 4 with terminal status (shown grayed).

5active projects
990active MW
9total filed
Queue IDProjectkVMWResourceStatus
J529 Not reported 345 250 Wind Operational
J877 Not reported 345 250 Solar Active
J1270 Not reported 345 200 Wind Active
J3324 Not reported 345 200 Wind Active
J731 Not reported 345 200 Wind Withdrawn
G554 Not reported n/r 100 Wind Withdrawn
J590 Not reported 345 90 Wind Operational
G317 Not reported n/r 80 Other Withdrawn
J938 Not reported 69 50 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.