Substation Scout

MISO request J3324

MISO queue ID J3324

Queue request J3324 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Palo Alto County, IA, according to Berkeley Lab’s queue data file. The filing names PALO ALTO - KOSSUTH COUNTY as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2029.

Queue IDJ3324
Project nameNot reported
Status (as published)Active
SubstationPALO ALTO - KOSSUTH COUNTY
Point of interconnectionPALO ALTO - KOSSUTH COUNTY 345.0kV
CountyPalo Alto
StateIA
Voltage345 kV
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2029-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Palo Alto, IA: 9 requests in the MISO queue, 5 active totaling 990 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMIDAMERICAN ENERGY CO.
ClusterDPP-2023 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.